2018 / 2019 completed works. The Carlton Tower, The Lowndes, Grosvenor Apartments Park Lane.
- Carlton Tower Roof – complete surface refurbishment, removal of all existing surfaces and install of new liquid bitumen coating over an 8 week period.
- Peak Health Club 9th floor – complete refurbishment of treatment rooms, main gym floor, cardio studio & offices.
- Swimming pool complex – full project management of new ladies steam room and sauna install partnering klaffs.
- Oak panelling to Rib Room restaurant – bespoke joinery install to main dining area.
- Rib Room terrace – new marble floor install.
- Main & banqueting kitchens – full project management for procurement and install of commercial resin floor install.
- Guest suites – timber floor replacement to all suites.
- Indigo staff canteen – complete refurbishment of main dining and severy area across a 2 week period.
- Guest door replacement – bespoke manufacture, supply and install of new entrance doors to all guest rooms.
- Plant rooms – anti slip floor treatment application and install of new concrete bund upstands.
- Loading bay – full project management for procurement and install of gattic cover access chamber to existing electrical sub station.
- Loading bay – full surface redecoration and replacement asphalt road surface.
- Chinoiserie – bespoke privacy screen install for payment / conciegere terminal.
- Main entrance – refurbishment of art deco canopy and lighting.
- Main entrance – replacement granite set paving to in and out drive.
- External façade – high pressure doff steam cleaning to limestone cladding.
- Emergency sanitary clean to basement pipe breach.
Pending for 2019/2020
CARLTON TOWER CLOSED FOR REFURBISHMENT
- The Lowndes – balcony refurbishment to all suites.
- Isolated roof surface repairs, cyclical french polishing.
- Grosvenor Apartments – cyclical french polishing.